USA-FORM, INC. SUPPLIED FORMWORK FOR THE ABUTMENTS, COLUMNS, & PEDESTRIAN TUNNEL FOR KIEWIT ON THE GOLD LINE PHASE 2B PROJECT.
THIS PROJECT IS LOCATED IN VARIOUS LOCATIONS AROUND GLENDORA, SAN DIMAS, LA VERNE & CLAREMONT CALIFORNIA. USA-FORM BUILT ALL THE FORMWORK
WITH ALL BLOCK OUTS ATTACHED PRIOR TO SHIPPING. THE FORMWORK WAS DESIGNED TO HAVE THE WING WALLS AND ABUTMENT SEATS POURED IN ONE SHOT.
WITH MANY OF THE SURFACES BEING RADIAL, USA-FORM ENGINEERED AND FABRICATED TO MEET THESE CONDITIONS THAT WERE REQUIRED.
THIS PROJECT IS LOCATED IN VARIOUS LOCATIONS AROUND GLENDORA, SAN DIMAS, LA VERNE & CLAREMONT CALIFORNIA. USA-FORM BUILT ALL THE FORMWORK
WITH ALL BLOCK OUTS ATTACHED PRIOR TO SHIPPING. THE FORMWORK WAS DESIGNED TO HAVE THE WING WALLS AND ABUTMENT SEATS POURED IN ONE SHOT.
WITH MANY OF THE SURFACES BEING RADIAL, USA-FORM ENGINEERED AND FABRICATED TO MEET THESE CONDITIONS THAT WERE REQUIRED.